Valley Club GC Irrigation Pump Project

Valley Club GC Irrigation Pump Project

This project includes two identical suction lift pump stations that were engineered to replace previous pump stations that were requiring constant maintenance. Both of these replacement stations also needed to be totally enclosed for aesthetics and have the most compact footprint possible. They were craned in during install to avoid any damage to the existing trees and shrubbery.

Shepeard Reservoir Project – Skamania County, Washington

Shepeard Reservoir Project – Skamania County, Washington

This project includes two identical suction lift pump stations that were engineered to replace previous pump stations that were requiring constant maintenance. Both of these replacement stations also needed to be totally enclosed for aesthetics and have the most compact footprint possible. They were craned in during install to avoid any damage to the existing trees and shrubbery.

Village Walk North & South Irrigation Project

Village Walk North & South Irrigation Project

This project includes two identical suction lift pump stations that were engineered to replace previous pump stations that were requiring constant maintenance. Both of these replacement stations also needed to be totally enclosed for aesthetics and have the most compact footprint possible. They were craned in during install to avoid any damage to the existing trees and shrubbery.

Crenshaw 800 Irrigation Project

Crenshaw 800 Irrigation Project

This Vertical Turbine pump station is located in a semi-buried vault enclosure utilizes lake water mixed with treated effluent water to provide irrigation to a subdivision development of over 40,000 residents that is continuing to expand. It delivers 5000 GPM @ 100 PSI and has been in successful operation since 2014.

River Water Hovde Multi-Use Pump System Project

River Water Hovde Multi-Use Pump System Project

This industrial processing station is a combination Booster and Water Transfer pump system that supplies water to a local water depot, and also transfers large volumes of water to several remote water depots. It was engineered to do several different jobs and have a single Control Panel that reports to their telemetry system. This system arrived almost entirely “Plug-n-Play” so that all the end user had to do was tie in the plumbing and electrical connections, program the desired Set-Points, and the control system did everything required with very little on-site calibration.