Edge 72 Booster Pump Station

Edge 72 Booster Pump Station

Originally a design and build project for a water storage and distribution system. PPS worked with the general contractor and the civil engineer to create an integrated solution. The pump station is fed by on-grade storage tanks. The pump station pressurizes water for domestic usage and fire protection. The pump station control system also monitors tank levels and operates fill valves.

Shepeard Reservoir Project – Skamania County, Washington

Shepeard Reservoir Project – Skamania County, Washington

This project includes two identical suction lift pump stations that were engineered to replace previous pump stations that were requiring constant maintenance. Both of these replacement stations also needed to be totally enclosed for aesthetics and have the most compact footprint possible. They were craned in during install to avoid any damage to the existing trees and shrubbery.

Arbor & Adams Ridge Subdivision Project

Arbor & Adams Ridge Subdivision Project

This variable flow, constant pressure pump station is designed to supply up to 4500 GPM of filtered canal water for the pressurized irrigation systems of two subdivisions: Arbor Ridge and Adams Ridge.

Potable Centrifugal Booster Station

Potable Centrifugal Booster Station

Location: Eugene, Oregon • Flow Rate: 25 – 750 GPM • Boost Pressure: 51 PSI • Discharge Pressure: 77 PSI • Pumps: Two 40 HP End-Suction Centrifugal and Two 2 HP Vertical Multi-Stage

Customer Challenge: To design a low-cost, low-profile automated booster pump station to their exact specifications and purpose.